Enhancing Project Portfolio Management with Lean Principles to Navigate Cultural Maturity, Resource Constraints & Accelerate Facility Delivery

Time: 8:50 am
day: Conference Day One

Details:

  • Batching capital projects into structured portfolios to enable alignment with resource availability and minimize overload to improve delivery consistency across complex facility programs
  • Optimizing batch sizes within a stable production system to enhance flow and reduce variability, allowing teams to achieve shorter, more predictable cycle times
  • Advancing cultural maturity through targeted engagement to increase openness to change, enabling organizations to embrace lean practices and accelerate continuous improvement