Improving Planning With All Vendors From the Design Phase to Ensure Effective Resource Allocation

Time: 1:15 pm
day: Pre-Conference Day

Details:

  • Adopting the Optimized Cycle Time Flow (OCF) strategy to synchronize schedules and workflows across all vendors, ensuing maximum efficiency and minimizing peaks in resource demands
  • Enhancing inter-vendor communication and fostering seamless handoffs between different groups involved in tool installation and building construction
  • Identifying and managing constraints at both the program and incident level, ensuring resources are allocated effectively and potential bottlenecks are addressed proactively

Speakers: