Conference Day Two

7:30 am Registration & Networking

8:30 am Chair’s Opening Remarks

Overcoming Supplier Constraints

8:40 am Improving Planning With All Vendors From the Design Phase to Ensure Effective Resource Allocation

Synopsis

  • Adopting the Optimized Cycle Time Flow (OCF) strategy to synchronize schedules and workflows across all vendors, ensuing maximum efficiency and minimizing peaks in resource demands
  • Enhancing inter-vendor communication and fostering seamless handoffs between different groups involved in tool installation and building construction
  • Identifying and managing constraints at both the program and incident level, ensuring resources are allocated effectively and potential bottlenecks are addressed proactively

9:20 am Panel Discussion: Implementing Alternative Procurement Strategies to Mitigate Supply Chain Issues

  • Rachel Skiba Advanced Manufacturing Business Development, National, DPR Construction
  • Eric Opstedahl Director - Prefabrication, Briggs Electric Inc.

Synopsis

  • Shifting the procurement focus from merely price-based decisions: Evaluating the technical capabilities of staff and teams when handling these materials, ensuring the right fit for dynamic project needs
  • Developing a specialized supply chain groups to monitor, track and maintain relationships with suppliers, ensuring timely procurement and availability of critical materials
  • Investing in warehousing solutions to store pre-purchased items to mitigate supply chain disruptions and ensuring immediate availability when needed

Improving Jobsite Operations

10:00 am Investigating Successful Implementation of Off-Site Construction – Utilities & Complex Systems

Synopsis

  • Exploring unsuccessful and winning design methods
  • Understanding how Design Assist succeeds with specialist suppliers on the team
  • Examining examples from large scale OSC utility projects – Chillers are not the critical path!

10:40 am Morning Refreshments & Speed Networking

11:20 am Knocking Down the Traditional Construction Industry Siloes to Flatten Out the Steel Supply Chain

  • John Matuska Principal & Senior Project Manager, Ruby+Associates, Inc. Structural Engineers

Synopsis

  • Combining the design process and shop drawing production to eliminate lost time, lost knowledge and to mitigate risk
  • Creating more accurate BIM models earlier in the project to enhance design coordination
  • Collaborating with the entire team to make good decisions based on incomplete information, minimizing the amount of re-work

12:00 pm Evaluating Start Up & Commissioning Coordination for Semiconductor FAB Construction Projects to Enhance Facility Quality

  • James Kehoe Director - Advanced Technology, Consigli Construction Co. Inc.

Synopsis

  • Discussing the coordination, teaming and communication required to successfully execute in large scale FAB build outs
  • Highlighting the necessity of thorough performance testing and validation during the commissioning phase, ensuring that all systems operate at peak efficiency and meet the required specifications before full-scale production begins
  • Advocating for a proactive approach to supplier, Kehoe, James & Contractor engagement, focusing on alternative sourcing strategies and early procurement to mitigate risks associated with long lead times

12:40 pm Networking Lunch

Towards a More Sustainable Future

1:40 pm Uncovering Efficient Methodologies to Reduce Your Large-Scale Project’s Carbon Footprint

  • John Vardaman Advanced Manufacturing Market Leader, International, DPR Construction

Synopsis

  • Performing comprehensive life cycle assessments to reduce environmental impact from project inception through completion
  • Exploring strategies for achieving net positive water and power usage
  • Developing methods to reach effective waste diversion, ensuring all materials are reused, recycled or appropriately processed to eliminate landfill contributions

2:10 pm Setting Realistic & Sustainable Expectations for Power Generation, Delivery & Storage to Avoid Project Delays & Unexpected Costs

  • Don Hagen National Director - Business Development & Advanced Manufacturing, Affiliated Engineers Inc.

Synopsis

  • Accurately assessing and sizing your project’s power requirements, aligning expectations with realistic power availability at project inception
  • Addressing the lengthy timeline required for power generation and transmission infrastructure development, and integrating this into your project timeline
  • Implementing a mix of sustainable power generation techniques, such as waste-to-energy conversions, energy storage systems and alternative power sources, to complement power sources and ensure steady generation

2:30 pm
The Next Generation of Advanced Manufacturing Facilities

2:40 pm Panel Discussion: Examining Future Trends & Opportunities to Stay Ahead of the Game

  • John Raimondo Vice President - Advanced Manufacturing, Wolverine Building Group

Synopsis

  • Mapping out current construction trends in ongoing projects to identify best practices, technological advancements and emerging challenges that may shape the future of the advanced manufacturing landscape
  • Partnering with state economic development agencies to gain insights into regional opportunities, streamline project approvals and navigate the regulatory landscape
  • Developing flexible planning strategies that allow for quick adaptation to changing market conditions, ensuring that projects proceed smoothly despite fluctuations in costs, materials and regulations

3:30 pm Chair’s Closing Remarks

3:40 pm End of Conference